Bonna Indonesia supplied PLTU Batang 2,000-MW power plant, Indonesia’s largest power plant
PLTU Batang or Central Java Power Plant (CJPP), Central Java, Indonesia, is a 2×1,000-megawatt ultra-supercritical coal-fired power plant that has been known as the largest project of its kind in Indonesia.
Bonna Indonesia has provided 1,300 pressure pipes, each measuring 3.2 meters in diameter, or the equivalent of 23,000 tonnes of concrete; 1,550 spools; and 250 special fittings. Production time lasted 70 weeks.