Home » References » Pressure pipes » Pipeline Algeria
Pipeline Algeria
Location:   Algeria
Construction Year:   2007
Delivery included:   Pressure pipes
Consolis company:   Bonna Sabla
11 km of 2500 mm diameter pressure pipes for Algeria

Bonna Sabla SNC and Bonna Tunisie were awarded a significant part of a 90 km pipeline installed for the transfer of water from the Taksebt dam to Algiers and other cities - a major undertaking for Alegeria, scheduled to last 16 months. Bonna Sabla supplied an important part of the pipeline with steel cylinder concrete pipes.


Choose a Reference